Ready-mix concrete · QA record

The Delivery QA Record for ready-mix concrete

Plant ticket → site slump & temperature → cubes → 7/28-day results — one shareable record per delivery, instead of a paper trail split across a ticket book, WhatsApp and a cube register.

How a delivery becomes a record

1

Plant — 30 seconds

QC in-charge logs the delivery: ticket no., mix/grade, truck, quantity, batch time. A share link and QR are generated automatically.

2

Site link — no app, under 90 seconds

The site engineer opens a link on any phone — no login, no install. Arrival & discharge time, slump, temperature, water added, accept/hold/reject, one photo.

3

Cubes & reminders

A sample set is created against the delivery. 7- and 28-day due dates are tracked with reminders; results and lab reports attach to the same record.

4

Delivery QA Record

One chronological, printable record per delivery — plant, site and lab entries, who entered what and when. Ready to share, ready for audit.

Built for

  • RMC plant QC

    Replace the ticket book and the WhatsApp photo trail with one record per delivery, searchable by ticket, truck or site.

  • Developers with captive plants

    See every pour across sites and mixes in one place, with cube due-dates that don't depend on someone remembering a spreadsheet.

  • Site engineers

    Record arrival, slump and disposition in under two minutes on your own phone — no account, no app to install.

What it is not

  • Not an ERP — it doesn't run production, billing or dispatch.
  • Not a laboratory — it records and links results; it doesn't test concrete.
  • Does not decide acceptance — that stays with the Engineer-in-Charge under IS 456 and the project specification.